CS790z S/W Engineering
- Resources | Code | Schedule and Project Pages
- Gaslab code: GAAS | Googu | GA (Serial and Parallel) Code | Cigar
- The Syllabus in html and in postscript
- Every week we will have a design review and/or code review along with the material listed below.
Week What's Due Notes Comments Jan 25 One or two page Proposal Contents Feb 1 Version 1.0 (probably serial) Feb 8 Web interface to V1.0 Feb 15 Version 2.0 (parallel, 2 machines minimum) Feb 22 Breather (Catch up) Feb 29 Version 2.x (parallel, all machines) Mar 7 Performance Mar 14 Tuning Mar 22 Spring break Mar 28 Application specific WebInterface Apr 4 User Manual Apr 11 Programmer's Manual Apr 18 Preliminary Results Apr 25 Cleanup May 2 Final Report